Brand: Rompox
Product Code: ROMPOX1
Stock: In Stock
€45.99

Application

Rompox Easy Instructions
1. Pre-Wet

Thoroughly wet the surface and the substrate before you begin. This will ensure even filling and help with the cleanup when the installation is complete.

Note: Do not open the vacuum packed bag before you are ready to use it.

Rompox Easy Pour on
2. Pour on

Open the vacuum packed bag, and pour the ROMPOX® - EASY onto the surface.

Rompox Easy Work it in
3. Work in with squeegee

Work it into the joints with an easy sweeping motion. Use water to help settle it into the joints. Do not use excessive water pressure. It begins to harden immediately after the excess water evaporates or drains away.

Rompox Easy More Water
4. More water

Put more water on.

Rompox Easy Work in again
5. Work it in

Once hardening has begun, gently remove any surface residue. A broom works well for this step.

Note: Unused material can be saved for later use. Simply pour the remaining product into the empty bucket and cover the product completely with water. Make sure the water completely covers the product. Material stored in this way can be kept for up to one year. Do not save material that has begun to cure.

Rompox Easy Final Cleaning
6. Final Cleaning

Within 24 hours you can walk on the surface. Optimal temperature is 68 F, actual curing time will vary with temperature variation.